E-Mail '2022 Mortlake Public School Catchment Update' To A Friend

Email a copy of '2022 Mortlake Public School Catchment Update' to a friend

* Required Field




Separate multiple entries with a comma. Maximum 5 entries.



Separate multiple entries with a comma. Maximum 5 entries.


E-Mail Image Verification

Loading ... Loading ...

2 thoughts on “2022 Mortlake Public School Catchment Update”

  1. Thanks for this analysis! There are no residents at the moment in the patch changing hands, but there are some ambitious plans to redevelop the old Concord RSL (which is in the reserve), so the change means the future residents of whatever tower or complex that gets built there will be in Strathfield North instead of Mortlake.

Comments are closed.